Project Gallery

Here are some pictures of projects that we have undertaken using our fleet of cranes and hiabs.
 

Liebherr LTM1080

Full Fly with man basket inspecting pylon

Demag AC50

Full Fly with offset Lifting Roof Sheets

Demag AC40 City Class

Lifting New Sails into place at Sainsbury's Store in Plymouth

Grove GMK 5100

Lifting 34t Exhaust onto transport

Demag AC25 City Class

After Lifting Christmas Tree in Plymouth City Centre

Grove GMK3055

 

Installing Bridge Sections

Grove GMK5100

Our Grove GMK5100 working with Baldwin's Liebherr LTM 11000 and Abnormal Load Engineering's Gottwold AK912 Lifting boiler tubes in at Langage Power Station.

Grove GMK3055

Clearing Vegetation from Viaduct using Man basket and Skip

Colesmill Viaduct is a grade II listed 8 span railway viaduct on the  southern outskirts of Holsworthy. It's total length is some 128 metres ( 420 feet)  with a maximum height of 25 metres from the valley floor (80 feet)  The viaduct was opened in 1879, and closed in 1966. Each span is 50 feet (15.24 metres), The width between former parapet faces is 4.5m metres.